JINYUAN GREEN ADDITIVES FACTORY
Feedback
▏CONTACT US
Changzhou Jinyuan Green Additives Factory
Add:Changzhou xinbei district town industrial park in the southern district of Ben niu
National Free Sales Hotline:400-0519-399
Manager:Mr. Chen (0)13906128865
Tel:86-519-88881858 86-519-88881868
Fax:86-519-83211166
E-mail:crq@jylszj.com
Products
Silicone oil removal agent of the company is a high-tech product, use a small amount of silicone oil removal agent can be easily stripped of silicon on the fabric softener with the three finishing agent, no influence to dyeing and finishing processing. In acidic or alkaline conditions are effective. This product does not contain formaldehyde, APEO etc material, accord with environmental protection requirement.
【 Composition 】
Special polymer compound.
【 Characteristics 】
Outside view: light yellow transparent liquid;
Ion: the ion;
PH: 6 ~ 8;
Solubility: in any proportion dilution with water;
Stability: acid, alkali and hard water and electrolytes.
【 Characteristics 】
1, use removal of silicone oil removal agent and three proofing finishing agent has special effects;
2, use the stripping agent process is simple, less dosage, high efficiency;
3, for fabric dyeing, color patch or three proofing again provides easy and fast method.
4, used in acidic or alkaline conditions, have a good removal effect.
【 Application 】
1. Basic requirements: stripping agent: 2 ~ 10 g/l NaOH (98%) : 1 ~ 5 g/l
Bath ratio: 1 ~ 15 process conditions: 90 ℃ x 50 min
Into cloth, water and heating to 80 ~ 90 ℃, stripping agent, NaOH - insulation run 30 ~ 60 min - drainage, inject new water, adding suitable amount of no bubble soap lotion - 80 ~ 90 ℃ heat preservation soaping 20 ~ 30 min - > drainage, cleaning
2. The acidic conditions: stripping agent: 2 ~ 10 g/l pH: 3 ~ 4 (adjustable) by injection of acetic acid
Bath ratio: 1 ~ 15 process conditions: 90 ℃ x 50 min
Into cloth, water and heating to 80 ~ 90 ℃, adjust pH 3 ~ 4, silicone oil removal agent and insulation to run 30 ~ 60 min - drainage - 80 ~ 90 ℃ heat hot water washing 20 ~ 30 min - > drainage, cleaning
【Storage】
1. According to non-dangerous goods transport.
2. The plastic drum lined with plastic film 50/120/150 kg/barrel.
3. The plastic bucket sealed in a cool and ventilated place, storage period of one year .